
İBF Şehr-i Mahra
About the Project
İBF Şehr-i Mahra
İBF Şehr-i Mahra is a residential project located in Talas / Kayseri. Developer: İBF Doğan İnşaat. The project comprises 200 residential units. Unit types: 2-bedroom, 3-bedroom, 4-bedroom. Delivery date: Q3 2024.
İBF Şehr-i Mahra is a residential project located in the Talas district of Kayseri. The project is situated on Mevlana Mahallesi Mehmet Timuçin Caddesi and consists of a total of 200 apartments.
Unit Types
İBF Şehr-i Mahra is a residential project located in the Talas district of Kayseri. The project is situated on Mevlana Mahallesi Mehmet Timuçin Caddesi and consists of a total of 200 apartments. Developed by İBF Doğan İnşaat, this project is being delivered in the third quarter of 2024.
The project offers various apartment types. The options include 2.5+1 (135 m²), 3.5+1 (175 m²), 4+1 (190 m²), and 4.5+1 (215 m²) units. The living spaces are spacious and offer solutions suitable for every need.
The construction process of İBF Şehr-i Mahra is carried out in accordance with modern building standards, with quality being a top priority. When selecting building materials for the project, criteria such as durability and longevity were taken into account.
Located in Mevlana Mahallesi, the project has an advantageous location in terms of transportation. Situated approximately 700 meters from the tram stop, the project is surrounded by schools, markets, and various other amenities for basic needs. The İBF Şehr-i Mahra Sales Office is located in Talas / Kayseri.
Project Photos

















Project Features
Technical Specifications
Last Updated:
Location & Access
Frequently Asked Questions
How many floors does İBF Şehr-i Mahra have?
Can I obtain Turkish citizenship or a residence permit through this property?
Is this building built to current earthquake-resistance standards?
Guides about this region
Articles worth reading before you buy.
Keep Exploring This Area
Get offers for projects on sale in this area
New projects currently on sale in Kayseri
You can request information from the developer on the page of any current project in the same area.

Planned delivery: December 2026
Developer Firm
Profile